Carsten Burfiend Brooder House project completed
Katie Shepherd Hotel – site assessment
Boekeloo Cabin – phase 1 stabilization; first elevation
Ole Oleson Granary – completed siding
Charles and Hattie Olsen – Field restoration, build and installed basement windows, built storm windows; glaze, paint – 10 windows, built and installed kitchen window casings; build, stain and install trim
Martin Basch Farm – constructed and installed shed doors, mason repair on porch stone pillars, and poured concrete caps
Katie Shepherd Hotel Porch/NMI – Straighten structure, installed 2 new headers, removed old ceiling and flooring, sorted flooring to re-use, painted stain all ceiling and flooring; installed 2/3rds of ceiling.
C. Olsen kitchen – restored stove installed
Katie Shepard Hotel Porch/NMI – ceiling, flooring, header, trim, etc.
Advocated for changes in Glen Haven plan – change bus waiting area away from the Cannery
Stabilization of Barratt Pig Barn
Milled hemlock for projects with SEEDS
Charles and Hattie Olsen Farm – kitchen windows completed
Treat Farm – 6 outbuildings repaired using hemlock we milled; excavation to improve drainage around historic buildings
Ole Oleson Farm Field Clearing
Charles and Hattie Olsen Farm – Original icebox restored and installed, purchased and installed kitchen baseboard and vents
Katie Shepard Hotel Porch – stage 2 – completed dormer repair, stone repair, etc.
Treat Farm Farmhouse sill repair, field clearing.
Treat Farm Pig barn preservation completed, painted shed
Ole Oleson Farm field clearing
Received Collaborative Preservation Award from TC History Center
Monte Carlo Cottage Assessment and Historic Condition Report
First Port Oneida Picnic offered as fundraiser for Port Oneida Fair
Provided response to Port Oneida Cultural Landscape Management Plan
Katie Shepard Hotel – 4th year: Removed and salvaged as much of ceiling as possible; removed portions of damaged flooring; and replaced; fortified structural supports; repaired soffits; paint and glazing of windows; repaired and added structural support to dormers; paid for exterior house scraping and priming; volunteers painted finish coat on exterior, etc.
Treat Farm
- Contracted exterior house scraping, priming and painting
- Contracted repair work for both chimneys
- Contracted with Park to install portion of metal roof
- Field Clearing
- Remove mold from concrete porch
- Repair of eaves
- Repair stone foundation
Charles and Hattie Olsen Farm
- Contracted exterior spot scraping and priming of farmhouse. Volunteers painted.
- Stage one of silo chute repairs
Boekeloo Cabin – phase 2 contracted
- Restoration of logs; removal and replace foundational log;
- chinking; painting logs; log treatment
- partial removal of interior paneling